5.1 Water Winning SystemOnce the site areas are established, water winning systems will be installed to supply water to the rig site locations. The water winning system will be completed before the start of drilling activity.The quality and salinity of the water will be tested to determine if any additives are required to pre-treat the drill water for use as mix water for the drilling fluid.The water winning system will be connected directly to the drilling fluid mixing and recycling plant. Once all necessary connections are made, the tanks will be filled and all required pre- treatments undertaken before the drilling fluid dry powder is added.