4 imprimatura: General filling rib complete began to wipe the bottom ash should be around 2h, wipe before wipe a thin layer of ash, joint stratification loading gear, leveling, and vertical, horizontal scraping bar. Look, with wood trowel Mao Cha, and then check whether the formation of a grey, and with a vertical flat
7.3 doors and windows
1. aluminum alloy doors and windows wire supporting board check the wall installation
(1) selection of aluminum alloy doors and windows accessories and mountings, other than stainless steel, shall be the anticorrosion treatment.
(2) steel doors and windows frame before the installation, should first check the window and the size of the hole and embedded iron parts, general paint surface, the window frame hole width 50mm;The window height is 50mm; the door of the entrance of 25mm. Steel doors and windows installation requirements are shown in table 7.1.
4 imprimatura: General filling rib complete began to wipe the bottom ash should be around 2h, wipe before wipe a thin layer of ash, joint stratification loading gear, leveling, and vertical, horizontal scraping bar. Look, with wood trowel Mao Cha, and then check whether the formation of a grey, and with a vertical flat 7.3 doors and windows 1. aluminum alloy doors and windows wire supporting board check the wall installation (1) selection of aluminum alloy doors and windows accessories and mountings, other than stainless steel, shall be the anticorrosion treatment. (2) steel doors and windows frame before the installation, should first check the window and the size of the hole and embedded iron parts, general paint surface, the window frame hole width 50mm;The window height is 50mm; the door of the entrance of 25mm. Steel doors and windows installation requirements are shown in table 7.1.
正在翻譯中..
4 imprimatura: General filling rib complete began to wipe the bottom ash should be around 2h, wipe before wipe a thin layer of ash, joint stratification loading gear, leveling, and vertical, horizontal scraping bar. Look, with wood trowel Mao Cha, and then check whether the formation of a grey, and with a vertical flat
7.3 doors and windows
1. aluminum alloy doors and windows wire supporting board check the wall installation
(1) selection of aluminum alloy doors and windows accessories and mountings, other than stainless steel, shall be the anticorrosion treatment.
(2) steel doors and windows frame before the installation, should first check the window and the size of the hole and embedded iron parts, general paint surface, the window frame hole width 50mm;The window height is 50mm; the door of the entrance of 25mm. Steel doors and windows installation requirements are shown in table 7.1.
正在翻譯中..