remove the blanking caps (these caps must be fitted to the line drier during transit and storage ) . fit the line drier unit in the flow gas circuit pipe work . this is between the flow connector on the cryostream controller and the flow connector on the cryostream coldhead . do not leave the line drier open to the atmosphere as this will cause contamination .