. 13.4.6 interrupt timing: <br>. A job KTI powers and responsibilities of staff (supervisors), Contractors supervisor, ESH staff or managers at all levels have found any safety concerns, have the right to interrupt the execution of the job. <br>b. When performing high-risk operations, KTI personnel or personnel Contractors supervisor when in case of failure to spot supervision. <br>c. KTI engineer or supervisor Contractors in the job, if the program fails to find a job scheduled to meet the actual needs of the job, and must be changed or amended. This job should be obtained before it can continue execution after ESH agree. <br>d. exception handling an emergency situation, due to considerations aging process, reduce the impact on production, exception handling carried out after obtaining immediate supervisor was verbally agreed, but it can be executed job step should follow the norms of the special permit.