I have made the same product (different material number) before, so I don’t need to look at the CR, and I have confirmed it with Forever. However, you still need to go to CWT to see the MP. Please note
We have previously made the same product (with different part numbers), so we do not need to check the CR and have confirmed with Forever. But during MP, you still need to go to CWT to check. Please be informed that
The chairman of the board handed over an urgent matter. Do you need to stamp it? I have made the same product (different material) before, so I don't need to look at CR, and I have confirmed it with Forever. But you still need to go to CWT to watch MP. please note