2276.00m. Circulated hole clean, back reamed from bottom to 1789.00m, Pulled out of hole. Made up 12-1/4” directional drill BHA#3 with PD and ran in hole to bottom. Drilled 12-1/4” hole to 2581.35m, geology circulated, continued drilled hole to 2750.00m circulated hole clean, back reamed to 1900.00m, pull out of hole to surface. Retrieved 13-3/8” wear bushing. Prepared to run 9-5/8” casing. Ran in 9-5/8” casing to 2745.41m. Picked up cement head surface line. Circulated two bottoms up. Pressure tested 300psi/5mins & 3000psi/10mins, OK. Performed cement job. Lay down cement head surface line. Waite on cement. Serviced rig and cleaned up rig floor, well head job.