3.3 nitrogen purge operation procedure1) confirmed in 0172 main air valve, inlet valve 0392 1# filter (2# filter 0394), 1# filter separator outlet valve 0391 closed, check the instrument display normal;2) confirm the H0301, H0302 and H0303 heating furnace for heating furnace inlet valve is fully closed;3) confirm the filter and the residual liquid tank drain valve, vent valve closed;4) open 2# filter separator outlet valve 0393;Combustible gas detection in the field, 5;6) to enter the field of nitrogen vehicles, hose connection with the 2# filter separator front of the sewage valve (2);7) notice to start the system of nitrogen vehicle equipment, and adjust the pressure, observe the pressure gauge PG0392 tends to be stable;8) slowly open 2# filter separator (2 "ball valve), observe the differential pressure meter PDG0392 instructions, shall not be greater than 0.017MPa;9) beat pipeline is stable after manual slow to open the intake valve heating furnace for 3# (2 ball), and observe the pressure shall not be greater than 0.017MPa;10) observe and record the collection of effusion;11) to be gas pipeline out of the liquid to stop, close and 3# set aside the thermal furnace intake valve;12) off the 2# filter outlet valve 0393;13) off the 2# filter front end drain (2 "ball valve);14) to stop operation, pressure relief and remove hose;15) install the recovery process pipeline, leak detection, gas detection;16) report on the end of the pipeline nitrogen purge and drainage;17) to restore the site, close the work permit.3.4 ventilation operation1 preparation before ventilation1) confirm that the connection is well sealed, complete and complete;2) confirm the normal part of the connected pipeline;3) confirm the sewage outlet valve and vent valve in the closed state;4) confirm that the inlet and outlet valves of the filter separator are closed;Combustible gas detection in the field, 5.2 ventilation operation1) Notice MCC and CPF, first station ventilation operation;2) station control main valve 0172;3) manually slowly open 1# filter intake valve 0392, 2# filter intake valve 0394, so that the filter separator pressure gradually increased to work pressure;4) manual slow open outlet valve 0391 1# filter, 2# filter outlet valve 0393, pressure PDG0391 and PDG0392 observation, measure the initial pressure drop, manufacturers starting pressure drop 0.01Mpa;5) manually slowly open 3# reserved heating furnace air intake valve (2 "ball valve), gas replacement of nitrogen gas, the normal operating pressure drop of 0.015 ~ 0.08 MPa;6) in the 3# reserved heating furnace inlet valve outlet, real-time measurement of gas content;7) gas replacement is completed, close the 3# plus set aside the thermal furnace intake valve (2 "ball valve);8) pressure relief and remove hose;9) the combustible gas detection, leak detection qualified.3.5 the end of the sweeping operation1) clean up the work site;2) wash water hose;3) recovery process;4) recovery site.
正在翻譯中..