It includes all necessary cut and fill earthworks, compaction works of the original soil, all necessary tests to ensure the proper compaction as described in the relevant standards, codes and approved drawings, leveling and grading the existing grade level by discarding soil to a suitable pit near EMPLOYER camp, which location shall be decided in consultation with EMPLOYER and PMC.