1) To add 5% cap for indirect damages from the seller-caused major network outage, operation failure, data loss, etc. during integration, PAC test, trial run and FAC test period and exclude all other scenarios (walk-away from customer RFQ);
2) To control project execution and avoid major outage to trigger indirect damage