根据以上描述的码头布局,从作业任务角度看非跨越式双ASC调度作业就是将作业任务分配给相应的ASC并对分配的任务进行排序。Hu等[3]研究了确的英文翻譯

根据以上描述的码头布局,从作业任务角度看非跨越式双ASC调度作业就是将

根据以上描述的码头布局,从作业任务角度看非跨越式双ASC调度作业就是将作业任务分配给相应的ASC并对分配的任务进行排序。Hu等[3]研究了确定任务分配的非跨越式双ASC调度问题,其中任务分配已知的假设使得调度问题只需确定ASC的作业序列,然而任务分配决策是ASC调度问题的一部分。为了完整地研究非跨越式双ASC调度问题,本文研究考虑任务分配的非跨越式双ASC调度问题,其决策内容包括:1)分配任务集合;2)确定ASC的作业序列。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
Based on the above description of Terminal layout, double ASC non-leap from the perspective of job tasks scheduling is to assign tasks to the appropriate ASC and sort the assigned tasks. Hu [3] studies to determine assignment scheduling problem for non-leap-forward pair of ASC, which assignment known that allows scheduling only need to determine the sequence of operations of ASC, however ASC is scheduled in task allocation as part of the problem. To completely non-leap-forward pair of ASC scheduling problems, this study considered non-leaping double ASC assignment scheduling problem and its decision-making include: 1) assigned tasks set; 2) to determine the sequence of operations of ASC.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
According berth layout described above, from the perspective of a non-operational tasks Leaping double ASC job scheduling task is to assign tasks to the job and assigned a corresponding ASC order. Hu et al [3] studied the non-Leaping double ASC scheduling problem determination task allocation, task allocation among the known hypothesis makes scheduling problem Just make sure the job sequence ASC, but the decision is part of the ASC mission assignment scheduling problem. For a complete study of non-Leaping double ASC scheduling problem, this study considered a non-leap-tasking dual ASC scheduling problem, its decision-making include: 1) distribution of tasks set; 2) determine the job sequence of ASC.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
According to the above description of the layout of the terminal, from the point of view of the task, the task is to assign the task assigned to the corresponding ASC and the assignment of the task to sort the ASC. Hu [3] studied task allocation of non spanning double ASC scheduling problem, which makes the assumption of known task assignment scheduling problem only to determine the working sequence of ASC, however, task allocation is a part of the ASC scheduling problem. In order to complete the study of non leap double ASC scheduling problem, task allocation of non spanning double ASC scheduling problem is considered in this paper, the decision contents include: 1) assign the task set; 2) to determine the operation sequence of ASC.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: