Under the high pressure line construction bored pile, the scope of the influence of CWB60-CWB75 a total of 16 piles, the length of the pile body design 41m steel cage length 41.8m, pile spacing 7m. Because the steel cage is bound connection is divided into 5 sections, fabrication of steel reinforcement cage, and 5 times down.
正在翻譯中..