300±10% KWp Solar Rooftop Power Plant to be installed at Angus works
Scope of work: Scope of Supply & Work includes all, design, engineering, manufacture, procurement & supply of equipment, and materials, testing at manufacturers works, inspection, packing and forwarding, supply, unloading at site, associated civil works, services, permits, installation and incidentals, insurance at all stages, erection, testing and commissioning of 300±10% KWp Grid Interactive Solar PV Power Plant with associated equipments and materials on turnkey basis at Angus works.
A. The equipment and materials for 300±10% KWp Grid Interactive Solar PV Power Plant with associated system (Typical) shall include but not be limited to the Supply, Erection, and Testing & Commissioning of the following:
a) Solar PV modules in array including mounting frames, structures, foundation bolts & nuts for holding structures (grouting on terrace), earthing grid design and module inter-connection.
b) All System Junction boxes, fuse boxes, distribution boxes, MCBs, surge arrestors.
c) Power Conditioning Units (PCU) with SCADA monitoring.
d) LT Power interfacing panel, Plant monitoring desk, DC distribution Board.
e) Digital voltmeter & ammeter, KWh meters, Metering instrument, Protection relays along with battery panel.
f) LT Power & control cables including terminations & other accessories required for both AC & DC power.
g) Data acquisition system with remote monitoring facilities.
h) Lightning arrestors, PVC pipes & accessories / trenches.
i) Trivector meter with Main & check meter.
j) Metering set & Protection or isolation systems.
k) Power and Control Cables.
l) Earthing system for PV Array, DC power system, lightning protection system.
m) Transportation, unloading and loading, storage of all equipment at Site.
n) Erection, testing & commissioning of all supplied materials.
o) Project Management including adherence to all requisite safety practices.
p) Fire extinguishers, name plates, danger boards etc.
q) Training of technicians / executives.
r) Control room equipment related to solar system, mandatory spares for 20 years operation.
s) Any other material / equipment required to complete the project.
t) Design of 300±10% kWp Grid Interactive Solar Power Plant with Higher generation unit and lower generation cost will have to be achieved. The associated electrical & mechanical auxiliary systems includes preparation of single line diagrams and installation drawings, electrical lay outs, erection key diagrams, electrical and physical clearance diagrams, design calculations for Earth- mat, Bus Bar & Spacers indoor and lighting/illumination etc. design memorandum and other relevant drawings and documents required for engineering of all facilities within the area to be provided under this contract, are