(5) Where paragraph (4)(c) applies, those requirements of Part 2 of Sc的中文翻譯

(5) Where paragraph (4)(c) applies,

(5) Where paragraph (4)(c) applies, those requirements of Part 2 of Schedule 1, which are indicated in column (3) of the table in Schedule 4 opposite the description of the refurbishment work, apply in relation to that work.
(6) Paragraph (4) (c) does not apply to refurbishment work which—
(a) only comprises like for like replacement;
(b) is required to be carried out by a contract in writing entered into before 28th April 2014; or
(c) is carried out in-house by the operator pursuant to an arrangement made in writing before 28th April 2014.
(7) Paragraphs (3) and (4) are subject to any exemption order which applies to the rail vehicle.
0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
(5) 款 (4)(c) 适用,那些要求部分附表 1 2 在 (3) 在表格列中附表 4 对面的翻新工作的说明指出,适用于这项工作。(6) 第 (4) (c) 款不适用于翻新的工作 — —(a) 只包括像为像更换;(b) 需要由在 2014 年 4 月 28 日; 前订立的书面合同,进行或(c) 进行内部由操作员根据以书面形式在 2014 年 4 月 28 日之前作出安排。(7) 第 (3) 和 (4) 受任何豁免令适用于铁路车辆。
正在翻譯中..
結果 (中文) 3:[復制]
復制成功!
(5)在第(4)(c)适用于那些要求附表1 2部分,分别显示在列(3)附表4对翻新工作描述表,适用于工作。(6)第(4)(c)不适用于翻新工作—(一)只包括象似的更换;(乙)须于2014年4月28日之前订立的书面合同须进行;或(丙)是根据在2014年4月28日之前以书面方式安排的,由经营者进行的。(7)(3)及(4)款适用于任何适用于铁路车辆的豁免令。
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: