In conditions of a disaster clean water should be available in the disaster areas as soon as possible,
preferably within 12 h after the disaster. The MHMWTP, as designed by ITB, is capable of treating
raw waters with fluctuations in turbidity (up to a turbidity of 10,000 NTU) by a series of treatment
processes all mounted on a truck (Garsadi et al. 2009). The processes are simple to operate stand
alone as power supply is included in the mobile plant by a small generator (5 kW). The mobile
plant needs only 1,000–2,000 Watt for power supply and has a clean water production capacity of
400 m3/day.