The one year minimal interval for periodic testing may be extended to two years if the manufacturer employs a “Production Testing Plan,” which consists of a written plan that establishes a schedule and requirements for in-house testing of production runs at each manufacturing site. This in-house testing does not need to be performed by a CPSC-accredited, third party lab, and it does not need to comply with test methods required by CPSIA.