9.3.3.作業內容說明9.3.3.1.各部門制定方案時,除考量5.1.2項目外,亦應將職業安全衛生機會納入方案考量。ESH KPI 自主改的英文翻譯

9.3.3.作業內容說明9.3.3.1.各部門制定方案時,除考量5.1

9.3.3.作業內容說明9.3.3.1.各部門制定方案時,除考量5.1.2項目外,亦應將職業安全衛生機會納入方案考量。ESH KPI 自主改善項目可做為職業安全衛生機會項目之一。9.3.3.2.方案執行期間,若遇到困難無法執行時,應重新審視方案內容進行修正,並依作業流程執行。9.3.3.3.方案執行成果需於管理審查會議時呈現。9.3.3.4.方案保存則由權責部門依『紀錄管制程序書』執行;ESSH KPI自主改善項目則由環境安全衛生單位存檔備查。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
9.3.3. Job Description <br>9.3.3.1. When the various departments to develop programs, in addition to considerations 5.1.2 projects, should also be included in the program the opportunity to occupational safety and health considerations. ESH KPI improvement projects can be used as one of the independent Occupational Safety and Health project opportunities. <br>9.3.3.2. During the implementation of the program, if the difficulties can not be executed, should re-examine the program content is corrected, and perform in accordance with processes. <br>9.3.3.3. The results of implementation of the program to be presented to the management of the Review Conference. <br>. 9.3.3.4 program saved by the department in accordance with the powers and responsibilities "record control program book" execution; ESSH KPI self-improvement project by the Environmental Safety and Health Unit records.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
9.3.3. Job Description<br>9.3.3.1. In developing programmes, occupational safety and health opportunities should also be included in the programme, in addition to item 5.1.2. The ESH KPI Autonomous Improvement Program can be used as one of the Occupational Safety and Health Opportunities programs.<br>9.3.3.2. During programme implementation, if difficulties are not possible to implement, the programme content should be re-examined for revision and in accordance with the operational process.<br>9.3.3.3. Programme implementation results need to be presented at the Management Review Conference.<br>9.3.3.4. Programme preservation is carried out by the responsible department in accordance with the Records Control Procedure, while the ESSH KPI Autonomous Improvement Project is reviewed by the Environmental Safety and Health Unit.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
9.3.3. Job description<br>9.3.3.1. When making plans, all departments shall consider not only 5.1.2, but also occupational safety and health opportunities. ESH KPI self improvement project can be used as one of the occupational safety and health opportunity projects.<br>9.3.3.2. During the implementation of the scheme, if it is difficult to implement, it is necessary to re-examine the contents of the scheme for correction and implement according to the operation process.<br>9.3.3.3. The results of programme implementation shall be presented at the management review meeting.<br>9.3.3.4. The plan shall be kept by the responsible department in accordance with the record control procedure; the ESH KPI independent improvement project shall be filed by the environmental safety and health unit for future reference.<br>
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2025 I Love Translation. All reserved.

E-mail: