Is the set 'Traceability system, proofreading certificate, and inspection report' concerning the proofreading of the measuring instrument three points kept?
Is there a rule that confirms whether there is abnormality before it begins to work (back)?
When abnormality can be confirmed at that time, are the recovery method to goods that have been produced clarified?