Fences R/R Please indicate fence types in Master plan.
Parking space R/R Please indicate parking space in Master plan.
Signage R/R Please indicate the location of signage.
MJTD’s facilities R/R Please indicate MJTD’s facilities such as sewage manhole, electrical pole and etc.
General DWG
Maintenance A/A Please submit general plan of Maintenance and Electric Power Workshop.
Factory R/R Please indicate size of all canopies.
R/D Section DWG R/R Please indicate sewage pipe invert level.
Clearance between existing water pipe and outlet pipe are should be at least 150mm.
W/S Connection Detail A/A Please submit detail drawing for the connection of water supply.
W/D Connection Detail R/R Please submit detail drawing for connection of sewage.
Detail DWG Protection Detail A/A Please submit the protection detail drawing for MJTD existing facilities at the entrance
including Box-culvert.
P/S Design Approval for
Power System
Info. MJTD would like to inform locator need to apply "Design Approval Application for Power
System" for electrical design separately from this design approval.
Others Underground tank R/R Please indicate relationship between top of the underground tank and ground level.
Mechanical and Electricity drawing for each building are no need to submit to MJTD.
Some drawing is not complete.
A/A Please submit detail drawing of Material Tank.
Soil balance Please submit the calculation of soil balance.