where ai, bi, ci, the cost function coefficients of unit; PGi the real power generation of unit i; Ng, the total number of generation units and i=1,2,…,Ng.. The objective function reflects the costs associated with generating power in the system. This objective
function will minimize the total system costs, and does not necessarily minimize the costs for a particular area within the power system.