In response to the flash from the bag dump station and the subsequent loud thump, workerscongregated at the entrance to the pre-mix room. Employees stated that the rubberizedspiral-wound duct hose material that connected T-306 to the dust collection riser appearedto be melting and dripping onto the tank (Figure 6).