SNOW WHITE does not neccessary need any platform for installation. However if she is
installed on the ground it is a good thing to cast a concrete platform fro installation.
This platform should be wide enough so that station operator can work on it when changing
filters or doing service work.
JL-900 SNOW WHITE is normally placed on a concrete platform, 10-15 cm thick.
Normally customer leads electricity and data cables to sampler,under ground for safety reasons.
For that purpose there should be placed pipes, tubes for them before laying the concrete.
Cables should run c. 50 cm apart from each other.
Electricity cables:
For pump unit: 3- phases, 1,2,3+0+PE, depending on distance, 9kW
For measuring unit: 1-phase, 1+0+PE from stations UPS, 250W.
Data cable: We will provide when we know the needed length.