How to reduce the energy consumption of injection molding process, the energy consumption of injection molding process is about 60%, which is an important way to reduce the energy consumption of injection molding machine. With the continuous improvement of energy saving technology in the injection molding machine, reducing the overall energy consumption of the injection molding plant needs to be considered comprehensively from the aspects of production management, processing technology and materials, production workshop, and so on. The layout of the production workshop in the production workshop is mainly from two aspects: to meet the requirements of production and optimize the layout according to the production process and meet the requirements of the flexible use of the specific production conditions.
1. power supply,In order to meet the requirements of the stability of the power needed for the same time, there is an appropriate margin, not too large to produce a large amount of excess capacity.
2. construction of efficient cooling water recycling facilities for the cooling water system with an effective insulation insulation system.
3. optimization workshop overall production layout. Many production processes have successively working procedure, reasonable coordination can reduce the time and energy consumption, improve production efficiency.
4. lighting and other plant equipment as far as possible to consider the most effective small units for control.
5. on the workshop equipment to do regular maintenance, to avoid damage to public facilities, affect the production of normal operation, and thus cause energy consumption.
(two) injection molding machine injection molding machine injection molding machine is a large energy consumption, energy consumption is mainly for the two part of the motor and heating.
1. according to the characteristics of products to choose a suitable injection molding machine. "Big horse pull car" type of injection molding process often means a lot of energy waste.
2. selects all electric injection molding machine and the hybrid injection molding machine, has the outstanding energy saving effect, can save energy 20-80%.
3. adopts new heating technology, such as electromagnetic induction heating, infrared heating, etc., can realize the 20-70% heating energy saving.
4. for heating, cooling system using effective insulation measures to reduce heat, cold loss.
5. maintain good lubrication of equipment,Reduce the increase in energy consumption due to the increase of friction or the operation of the device.
6. selection of low compression hydraulic oil, reduce the hydraulic system work energy waste.
7. adopts the technology of parallel operation, multi cavity injection molding, injection molding and other processing techniques, which can save energy.
8. traditional mechanical hydraulic injection molding machine also has a variety of energy-saving drive system, instead of the traditional quantitative pump mechanical hydraulic injection molding machine energy saving effect is remarkable.
9. regularly on heating and cooling pipeline maintenance, to ensure that the internal pipeline without impurities, scale blockage phenomenon, to achieve the design of the heating and cooling efficiency.
10. to ensure that the injection molding machine is in good working condition.The unstable machining process may lead to inferior, and increase energy consumption.
11. to ensure that the use of equipment for the processing of products, such as the use of special PVC processing.
(three) the structure and mold of injection mold die often have a significant effect on the injection molding cycle and energy consumption.
1. reasonable mold design, including the flow channel design, gate form, the type of cavity number, heating cooling water, etc., are helpful to reduce energy consumption.
2. uses hot runner mold, not only can save material, reduce material recycling energy consumption, the process itself has a significant energy saving effect.
3.Fast cooling fast thermal profiling mould can significantly save energy consumption and processing, achieve better surface quality.
4. to ensure that the filling of the cavity is helpful to shorten the molding cycle, to ensure the quality of the product is uniform, and has excellent energy saving effect.
5. using CAE aided design technology for mold design, mold flow analysis and simulation, it can reduce the mold debugging and the energy consumption of many times.
6. in the premise of ensuring the quality of the product, the use of lower clamping force molding, help to extend the life of the mold, the mold is full of fast, help energy saving.
7. to do the mold maintenance work, to ensure the effective heating cooling water channel condition.
(four) peripheral equipment
1.Choose the auxiliary equipment for the ability, not only to meet the work requirements, but also not rich.
2. good equipment maintenance, to ensure that the equipment is in normal working condition. The work is not normal auxiliary equipment, will cause the production of unstable or even poor quality, resulting in an increase in energy consumption.
3. to optimize the operation and operation sequence of the host and peripheral equipment.
4. optimization of the peripheral equipment and production equipment, the location of the operation, in the condition of no influence, as far as possible to make the surrounding equipment closer to the host.
5. a lot of auxiliary equipment manufacturers to provide on-demand system, can achieve significant energy saving.
6. using fast and changing device,Reduce the waiting time needed to switch products in production.
(five) the energy consumption of different materials is different, and the management of the material is not good or the improper management of the material will cause the increase of production energy consumption.
1. to meet the performance of the premise, the priority should be given to the lower processing energy consumption of the material.
2. to meet the use of performance and cost optimization of the conditions, the first choice of high mobility materials.
3. note that different suppliers of materials may have different process conditions. Drying process of
4. material, with the best drying with use, avoid the waste of energy after drying damp.
5. good material preservation,To prevent the material mixed with impurities or foreign body, resulting in poor products.
6. part of the product allows to add a certain recycled material, but should pay attention to the preservation of renewable materials and clean degree, to avoid the material is not clean produce parts bad.
(six) processing technology
1. to meet the performance of the premise, the use of the shortest molding cycle.
2. if there is no special factors, the use of the recommended processing technology for processing. . for a particular product and die, for all stable equipment and process parameter save next replacement production machine tune time to shorten.
4. optimization process, the lower clamping force,Shorter cooling time and holding time.
(seven) the use of new technologies, such as gas assisted, liquid assisted, steam assisted, micro foam injection molding technology, etc., using the new technology
1.
2. adopts the method of the unit to reduce the intermediate link.
3. adopts new technology, such as mold welding, mold spray, mold assembly, and interior decoration.
4. uses new low pressure molding technology, shorten the molding cycle, and can reduce the melt temperature.
5. uses energy regeneration system.
(eight) production management
1. a one-time production of high quality products, reduce the rate is the largest energy saving.
2.Maintenance and energy consumption of the whole production system is closely related to. This is not only related to the host, as well as the surrounding and factory equipment, such as the replacement of the workshop for crane failure, the need to change the human model, is bound to extend the waiting time of the equipment, resulting in increased energy consumption.
3. is equipped with workshop energy consumption monitoring system, which is convenient for enterprises to implement energy analysis and improvement.
4. equipment maintenance, not only check the maintenance of the equipment itself and the project, but also to pay attention to the connection between the equipment and other systems, the performance is reliable, etc..
5. regular and industry benchmark for comparison, to see whether there is further improvement in space.
6.With the supplier to establish a reliable contract and cooperative relations, the enterprise energy saving management useful.
正在翻譯中..