Before the next batch of mass production, Φ4.0 will be controlled, and after the formation, the dimensions will be re-measured and traced for three batches.
Before the mass production of the next batch, Φ 4.0 should be controlled, and after the formation, the dimension should be retested to trace three batches.<br>