4.4 absorber outlet to chimney inlet flueThe common absorption tower outlet and the chimney outlet section for #5 furnace and #6 furnace, the calculation results and simulation results, the main position is located in the entrance pressure drop and the chimney chimney entrance elbow, chimney entrance structure inconvenience modification, this optimization only for the chimney entrance elbow, optimization method for installing the guiding device, reduce the bend of recirculation zone to reduce the pressure loss.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)