Dear all,
Please check and confirm the attached final version of the contract already with the annex asked by KCG
for possible “acceptable differences” between quality surveys- all per Anec 43-44 but mentioned within
the contract.
You can check the yellow marks and the annex at the end.
We need confirmation to conclude and sign.
Regards
Moshe