The first 2 to 3m of the flattened base were underlain by a lining of high-density, porous polyethylene mesh, laid some 150 mm beneath the soil surface, to safeguard against erosion. Local unskilled labour was used in the construction phase of the project. This was important in the context of high unemployment in the local community.