The chords were formed from lengths of steel spliced together using L shaped section of steel. The splices were connected using clinching. Fig. 12 shows the load–deflection behaviour of the truss throughout its full loading history During the test it was noticed that the splice in the bottom chord was beginning to open and this can be seen as the increase in rate of deflection.