Steering of the pilot hole is undertaken by the steering engineer who 的繁體中文翻譯

Steering of the pilot hole is under

Steering of the pilot hole is undertaken by the steering engineer who instructs the driller to perform any required steering corrections to maintain the designed profile. The direction of the pilot hole is maintained by controlling the high side of the BHA, where no profile corrections are required the drill rod can be rotary drilled. When steering corrections are required the BHA is advanced without rotation allowing the bend in the BHA to alter the direction of the drill bit.Once each drill pipe is steered along the profile, the drill string and BHA will be rotated and the full joint of drill pipe pulled back and re-advanced back along the bore. This is undertaken to ensure all of the drill cuttings are suspended in the drilling fluid for removal from the hole.A survey reading is taken at the end of each drill pipe and the details logged on to the pilot hole record sheet. Once the initial survey is complete and whilst the pilot hole is within the surface ParaTrack grid a secondary check on the downhole probe location will be undertaken.The surface grid will be charged with an AC current. The survey probe is able to detect the induced current and reports its position within the surface grid. This data is compared to the initial survey reading thereby providing a secondary check on the pilot hole location.Once the survey readings are complete, the drill string will be ‘broken’ and another drill pipe added on the rig. The wireline connection is cut and remade as every joint of drill pipe is added.The procedure for breaking and remaking the wireline connection is as follows:• The drill pipe tool joint will be unscrewed and the wire line cut leaving sufficient spare to make the next connection;• Drillpipewiththewirelinepre-installedwillbemovedontotherigfloor;• Thewirelineconnectionsaremadeusingametalwirecrimp,withacableshrink sleeve(sealed with the application of a hot air blower) the joint is then tape wrapped;• Ahandpulltestandvisualinspectionisundertakenoneachwirelineconnectionto check the joint is sealed,• Once the wireline connection is complete the drill pipe tool joint will be fastened and torqued up allowing drilling operation store-commence.
0/5000
原始語言: -
目標語言: -
結果 (繁體中文) 1: [復制]
復制成功!
導向孔的轉向由轉向工程師,誰指示鑽來執行任何需要的轉向修正,以保持設計的輪廓進行。導向孔的方向通過控制BHA,其中沒有輪廓校正所需的鑽桿可以是旋轉鑽孔的高側維持。當需要轉向校正的BHA是不旋轉,允許在BHA彎曲來改變鑽頭的方向前進。<br>一旦每個鑽桿沿輪廓轉向,鑽柱和BHA將被旋轉和鑽桿的全聯合拉回,並沿孔重新回到先進。這被進行,以確保所有的鑽屑的懸浮在用於從所述孔除去所述鑽井液。<br>調查讀取在每個鑽桿的端部和細節登錄到導向孔記錄片材。一旦初始調查完成,而導向孔是表面ParaTrack網格上井下探頭位置的次級檢查將進行內。<br>表面網格將被控以交流電流。該調查探針能夠檢測感應電流並報告其表面網格內的位置。該數據是相對於初始調查讀取,由此提供在所述導頻孔位置的次級檢查。<br>一旦測量讀數是完整的,鑽柱將被“打破”,並加上了另一個鑽機鑽桿。有線連接被切斷,作為重拍添加鑽桿的每一個關節。<br>打破和改造有線連接的步驟如下:<br>•鑽桿鑽具接頭將被旋松和電線線切割線留出了足夠的備用,使下一個連接; <br>•Drillpipewiththewirelinepre-installedwillbemovedontotherigfloor; <br>•Thewirelineconnectionsaremadeusingametalwirecrimp,withacableshrink套筒(與熱空氣鼓風機的應用密封)的接頭然後膠帶包裹; <br>•Ahandpulltestandvisualinspectionisundertakenoneachwirelineconnectionto檢查接頭密封<br>•一旦有線連接完成鑽桿鑽具接頭將被固定並扭轉了使鑽井作業商店開始。
正在翻譯中..
結果 (繁體中文) 2:[復制]
復制成功!
先導孔的轉向由轉向工程師負責,該工程師指示鑽孔人員執行任何所需的轉向修正,以保持設計的輪廓。通過控制 BHA 的高側來保持先導孔的方向,無需進行齒形修正,鑽杆可以旋轉鑽孔。當需要轉向修正時,BHA 處於高級,無需旋轉,允許 BHA 中的彎道改變鑽頭的方向。<br>一旦每個鑽杆沿著輪廓被引導,鑽柱和 BHA 將旋轉,鑽杆的完全接頭將拉回並沿著孔重新推進。這是為了確保所有鑽屑都懸掛在鑽井液中,以便從孔中拆下。<br>在每個鑽杆的末端進行測量讀數,並將詳細資訊記錄到先導孔記錄表中。一旦初始測量完成,當先導孔位於表面 ParaTrack 網格內時,將對井下探頭位置進行二次檢查。<br>曲面網格將充滿交流電流。測量探頭能夠檢測感應電流並報告其在表面網格中的位置。這些資料與初始調查讀數進行比較,從而對先導孔位置進行二次檢查。<br>一旦測量讀數完成,鑽帶將被"損壞",並在鑽機上添加另一根鑽杆。隨著鑽杆的每個接頭的添加,將切割和重新製作電線連接。<br>斷開和重新建立有線連接的過程如下:<br>• 鑽杆工具接頭將被擰下,電線切割留下足夠的備件進行下一次連接;<br>• 帶線線的鑽管預先安裝後,將移入地底;<br>• 線線連接,用金屬絲,帶可熔收縮套筒(用熱風機進行密封),然後將接頭膠帶包裹起來;<br>• 手拉式和目視檢查在每一條電線連接上檢查接頭是否密封,<br>• 電線連接完成後,鑽杆工具接頭將被固定並擰緊,從而允許鑽孔操作存儲啟動。
正在翻譯中..
結果 (繁體中文) 3:[復制]
復制成功!
導向孔的導向由導向工程師負責,指導司鑽進行所需的導向校正,以保持設計剖面。通過控制BHA的高側保持導向孔的方向,在不需要剖面校正的情况下,可以旋轉鑽取鑽杆。當需要轉向修正時,BHA在不旋轉的情况下前進,允許BHA中的彎曲改變鑽頭的方向。<br>每根鑽杆沿剖面定向後,將旋轉鑽柱和BHA,並將鑽杆的整個接頭沿井眼向後拉和再向前推進。這樣做是為了確保所有鑽屑都懸浮在鑽井液中以便從孔中取出。<br>在每根鑽杆的末端進行量測讀數,並將詳細資訊記錄在導孔記錄表上。初始量測完成後,當導孔位於地面平行網格內時,將對井下探頭位置進行二次檢查。<br>地面電網將由交流電充電。量測探頭能够檢測感應電流並報告其在表面網格內的位置。將該數據與初始量測讀數進行比較,從而對導孔位置進行二次檢查。<br>一旦量測讀數完成,鑽柱將“斷裂”,並在鑽機上添加另一根鑽杆。每新增一個鑽杆接頭,就要切斷並重新製作鋼絲繩接頭。<br>斷開和重新製作電纜連接的步驟如下:<br>•鬆開鑽杆工具接頭,切斷電線,留出足够的備用空間,以便進行下一次連接;<br>•預先安裝好鋼絲繩的鑽杆將被移到地面上;<br>•電線連接採用金屬線壓接,並帶有一個收縮套管(用熱風機密封),然後用膠帶包裹接頭;<br>•檢查接頭是否密封,<br>•鋼絲繩連接完成後,將緊固鑽杆工具接頭並擰緊,以便開始鑽井工作。<br>
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.