The secondary grid comprises a copper cable laid on the ground/ river bed with the co-ordinates of each change in direction known.In advance of the start of drilling activities the corners of the grid will be surveyed, survey stakes installed and the locations entered into the steering tool software.The copper cables will not be installed until the grid is required for use.It is anticipated that grids will be installed along the majority of the river bed, especially in the proposed intersect area.