where the Ex certificate specifies routine tests or inspections, these shall be carried out
on each product. They may be carried out by either the supplier or the manufacturer.
When carried out by the supplier, this shall be specified on the purchasing documents,
e.g. by a quality plan, and confirmed by the supplier, e.g. by a declaration of conformity
according to ISO/IEC 17050-1 including test results, if required;