The geometric shape, choice of material, surface condition, surface protection, functional requirements, prescribed manufacturing processes etc. shall be based exclusively on the bills of materials, circuit diagrams, drawings, data sheets and other documents which were provided and approved by BARTEC. The most recent drawing revision status (index) to be approved with the initial sample inspection report shall be binding for the serial delivery.