The primary objective of the project was to address flood control, by accommodating the 1:50 year flood; with secondary objectives including improving the amenity value along the river, preventing erosion of the riverbed and banks and, where possible, improving ecological function.
The project design involved the use of ‘soft’ engineering methods and included the following aspects: