Background
Borlänge municipality and Borlänge Energy have since 2000 an ongoing cooperation with municipality of Wuhan and theirs departments. In 2004 Borlänge Energy invited IVL to meet and also be a part of the Swedish team working with Wuhan. After some IVL projects in the Environmental Technology field 2007-2011, IVL had a meeting in April 2013 with Wuhan Sanitation Bureau where two topics in Waste Management was present.
1 Incineration of waste in five existing plants (WTE)
2 Landfills and a new planed recycling plant
With facts from this meeting IVL offers
Feasibility studies
General study about waste management in Wuhan
• Collecting data (se the IVL Questionnaire, file)
• EU waste directive
• EU waste management planning guideline (we use this as a guide, see file)
• Report and a education/presentation day
• Report is including today situation, recommendations of system changes and new investments.
35 000 Euro for consultants and experts.
Incineration study
• EU waste directive and incineration directive
• Report and a education/presentation day
• Report is including today situation, recommendations of system changes and new investments.
25 000 Euro for consultants and experts. (if the general study have been made)
Deep study/technical assistance for each plant
Must be calculated for each case, somewhere around 50 000 Euro.
Landfill including a new Recycling plant
• Technical assistance about the problems with the leachate water
• Technical assistance and experience of design of the recycling park.
25 000 Euro for consultants and experts. (if the general study have been made)
Prices are for Consultants and experts, excluding costs for travel, subsistence, etc.
Waste Management WuhanBackground Borlänge municipality and Borlänge Energy have since 2000 an ongoing cooperation with municipality of Wuhan and theirs departments. In 2004 Borlänge Energy invited IVL to meet and also be a part of the Swedish team working with Wuhan. After some IVL projects in the Environmental Technology field 2007-2011, IVL had a meeting in April 2013 with Wuhan Sanitation Bureau where two topics in Waste Management was present. 1 Incineration of waste in five existing plants (WTE)2 Landfills and a new planed recycling plant With facts from this meeting IVL offersFeasibility studies General study about waste management in Wuhan• Collecting data (se the IVL Questionnaire, file) • EU waste directive • EU waste management planning guideline (we use this as a guide, see file)• Report and a education/presentation day• Report is including today situation, recommendations of system changes and new investments.35 000 Euro for consultants and experts.Incineration study • EU waste directive and incineration directive • Report and a education/presentation day• Report is including today situation, recommendations of system changes and new investments. 25 000 Euro for consultants and experts. (if the general study have been made) Deep study/technical assistance for each plantMust be calculated for each case, somewhere around 50 000 Euro. Landfill including a new Recycling plant • Technical assistance about the problems with the leachate water • Technical assistance and experience of design of the recycling park.25 000 Euro for consultants and experts. (if the general study have been made)Prices are for Consultants and experts, excluding costs for travel, subsistence, etc.