2. Also in accordance with the regional geological exploration holes, hole No. S-28,29 data show that the region is widely distributed within the range of 43m below the surface sand and 20m range more memory in soft soil, PC easily lead to unload piles pressure bore hole collapse, which would not achieve good relief effect, which is also our earnest after the geological survey report analyzes the plant area, equipment used to pile into the hole 10 drilling machines maneuver without reason with auger , auger into the hole fast, flexible walking metastasis, when then its construction, drill holes in the wall of the hole on the large disturbance, and enhance drill too fast, easily lead holes were evacuated to a sharp increase in pressure on the cell walls large, especially in sand and soft soil formations more easily cause the collapse of the hole, making it difficult to get into the pile quality assurance, followed by 10-type machine into the hole pile for construction pore over with auger, greener earth into the hole which is generated in the process leading to the site muddy mud, collapsible main reason, it should choose a 10-type machine into the hole pile for construction.
3. 10-type machine into the hole when the pile construction, as long as reasonable construction layout, arrangement, live venues and roads can be controlled clean, tidy, with 3 # boiler, for example, according to the construction site layout (see page : 3 # boiler pile construction layout), clear pool of water needed to provide drilling, drilling mud mud pools accommodate generated in the process, when the mud more than half the volume of mud pools, should be transported by mud pump mud into a waste slurry tank, the waste slurry tank should be set up outside the factory, and should promptly clean up, to ensure adequate space. The use of PC pile construction, high requirements on plant roads, flatbed truck carrying piles of PC repeatedly rolling on the road will result in shortened life path, cause land subsidence pits, once encountered rain, the ground will be wet, muddy clay bear, found that 10-type machine into the hole pile construction can better maintain field capacity and maintenance and road construction sites.
In summary, in practical terms, the use of 10-type machine to pile into the hole construction has more advantages but also more meaningful.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)