Assumed load cases. One would expect that the load cases given in document (applied loads – basic load cases (dead, D, EXE, EYE, EV, WXP WYP) would be the same as the ones given in attachment 4. In attachment 4, for the seismic loading horizontal forces and moments are given. In the load cases in this document no moment can be found. Please explain more detailed how e basic load cases are built and how the load combination is assumed. Please also include a statement (Final result) regarding the bearing capacity and strength of the foundation).