Testing personnel in the ACM module GDU program download, just start the download is normal and GDU red and green light when program is finished loadingGDU red light, normal is download finished green light, after the replacement of the new GDU re download or red light. Later, according to the file test schematic check after foundThere is a problem with the IGBT, diode breakdown of a group of E2-C2 and bidirectional conduction and replace the new IGBT test normal. Million with surveying value are as follows: