Strict control is required for lightning welding and quality assurance inspection in the second class of production. Products cannot be restored to general inspection and control until the stamping is ready for production.
The thunder welding and quality assurance inspection of the second production section should be strictly controlled, and the general inspection and control of the products can only be restored when the stamping is in smooth production.<br>