⑸继续钻进压入护筒:卸下护筒卡具,更换钻头,继续钻进3~5m后,再继续压入护筒。从施工现场地质条件来看,地质条件较好,地下水位较低,一般钢护的英文翻譯

⑸继续钻进压入护筒:卸下护筒卡具,更换钻头,继续钻进3~5m后,再继续

⑸继续钻进压入护筒:
卸下护筒卡具,更换钻头,继续钻进3~5m后,再继续压入护筒。从施工现场地质条件来看,地质条件较好,地下水位较低,一般钢护筒埋深约2~3m即可。
护筒埋设完成后,进行正式钻进。钻进硬质土层时,应准确保证钻杆垂直,加大钻杆对土层压力,缓慢进尺,采用高转速,小跟进量,匀压钻进。在较松散的灰岩层中钻进时,要减缓进尺速度,减少钻杆晃动,以免扩大孔径。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
⑸ Press continues to drill into the casing:Remove the pipe clamps, change the drill bit and resume drilling after 3~5M, and then continued to press into casing. From the construction site of geological conditions, geological conditions, groundwater level is low, General steel casing depth is about 2~3M.Pipe laying is complete, drilling with an official. When drilling hard soil should be accurate and ensure the drill pipe vertically, increase the drill pipe to soil pressure, slow footage, using high speed, small amount of follow up, the level of drilling. When drilling in a relatively loose limestone, to slow driving speed, reduce the pipe shaking, so as not to expand aperture.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
⑸ continue drilling pressed into the casing:
remove casing fixtures, replace the drill bit to continue drilling 3 ~ 5m, and then continue to push into the casing. From the point of view of construction site geological conditions, geological conditions are better, the lower the water table, usually steel casing depth of about 2 ~ 3m can.
After the casing is buried completed formal drilling. When drilling hard soil, should ensure accurate vertical drill, drill pipe to increase the pressure on the soil, slow footage, high-speed, small amount of follow-up, the isostatic drilling. While drilling in a relatively loose limestone layer, to slow down the footage speed, reduce drill shaking, so as not to expand the aperture.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
The press to continue drilling casing:Remove the tube clamp, replacing the drill bit, drilling to 3 ~ 5m, and then continue to pressure into the tube. From the construction site geological conditions, the geological condition is good, the groundwater level is low, the general steel tube buried depth of about 2 ~ 3M can be.The embedding cylinder after the completion of the formal drilling. When drilling in the hard soil layer should be accurate assurance drill pipe vertical, increase the drill pipe to soil pressure, slow footage, using high speed, to follow up on small, uniform pressure drilling. Drilling in limestone loose when to slow penetration rate, reduce pipe shaking, so as not to expand the aperture.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: