⑸ continue drilling pressed into the casing:
remove casing fixtures, replace the drill bit to continue drilling 3 ~ 5m, and then continue to push into the casing. From the point of view of construction site geological conditions, geological conditions are better, the lower the water table, usually steel casing depth of about 2 ~ 3m can.
After the casing is buried completed formal drilling. When drilling hard soil, should ensure accurate vertical drill, drill pipe to increase the pressure on the soil, slow footage, high-speed, small amount of follow-up, the isostatic drilling. While drilling in a relatively loose limestone layer, to slow down the footage speed, reduce drill shaking, so as not to expand the aperture.