Extra-over item 8.2.1 for installation of pipes in areas where the working width is restricted for :
(a) DN800 pipeline installed in a possible wet area at CH6500
(b) DN800 pipeline installed in a DN1350 jacked concrete sleeve at R380 road crossings, located at Ch 125, CH1150 and CH15175
(c) DN800 pipeline installed in a DN1350 jacked concrete sleeve at a railway crossing located at CH32200
(d) DN800 pipeline installed parallel to an existing DN300 pipeline at CH32600
(e) DN700 pipeline installed in a DN1200 jacked concrete sleeve at mine access road crossing located at CH37630
(f) DN700 pipeline installed in a DN1200 jacked concrete sleeve at railway crossing located at CH37850
(g) DN700 pipeline installed close to Eskom powerlines at CH38510
(h) DN700 pipeline installed in a DN1200 jacked concrete sleeve at railway crossing located at CH49230
(i) DN700 pipeline installed in a DN1200 jacked concrete sleeve at railway crossing located at CH49750
(j) DN700 pipeline installed in a DN1200 jacked concrete sleeve at R31 road crossing located Extra over 8.2.1 for the supplying, laying, and bedding of specials complete with couplings;
Design, manufacture, supply, coat and line, factory test and inspect, store, transport, deliver, offload, install and commission, site test, adjustment and hand over of the pipework:
Bends with rigid polyurethane coating, solvent free epoxy lining, ends prepared for butt welding: