Engineering personnel to do the fault analysis, if has the ability to repair, then the fault repair, and the estimated repair time feedback production site supervisor for production scheduling and production units to make alternative arrangements;; if it is within four hours to repair, notice device using the unit of acceptance, acceptance by, acceptance in "NWEVII equipment repair and maintenance operations report" on the signature confirmation.