1.01 MOBILIZATION/DEMOBILIZATION 1.00 lot 30,202.63
30,202.63
1.02 HAULING/CLEARING/CLEANING 1.00 lot 52,302.11 52,302.11
1.03 MACHINERY/EQUIPMENTS/TRANSPORTATION/COMMUNICATION 1.00 lot15,469.64 15,469.64
1.04 SITE CONSTRUCTION MANAGEMENT/SUPERVISION 1.00 lot 13,996.34 13,996.34
1.05 CARI/INSURANCES AND OTHERS 1.00 lot 13,200.00 13,200.00
1.06 ATTENDANCE FEE FOR SUBCONTRACTORS 1.00 lot 2,500.00 2,500.00
1.07 DESIGN PROPOSAL AND PLANS 1.00 lot 27,500.00 27,500.00
1.08 AS BUILT PLANS (IF NECESSARY) 20,000.00
SUB-‐TOTAL 155,170.72
1.01 MOBILIZATION/DEMOBILIZATION 1.00 lot 30,202.6330,202.631.02 HAULING/CLEARING/CLEANING 1.00 lot 52,302.11 52,302.111.03 MACHINERY/EQUIPMENTS/TRANSPORTATION/COMMUNICATION 1.00 lot15,469.64 15,469.641.04 SITE CONSTRUCTION MANAGEMENT/SUPERVISION 1.00 lot 13,996.34 13,996.341.05 CARI/INSURANCES AND OTHERS 1.00 lot 13,200.00 13,200.001.06 ATTENDANCE FEE FOR SUBCONTRACTORS 1.00 lot 2,500.00 2,500.001.07 DESIGN PROPOSAL AND PLANS 1.00 lot 27,500.00 27,500.001.08 AS BUILT PLANS (IF NECESSARY) 20,000.00SUB-‐TOTAL 155,170.72
正在翻譯中..
1.01动员/复员品种30,202.63 1.00
30,202.63
1.02牵引/结算/清洁品种52,302.11 1.00 52,302.11
1.03机械/设备/交通/通讯lot15,469.64 1.00 15,469.64
1.04现场施工管理/监理品种13,996.34 1.00 13,996.34
1.05 CARI /保险,其他品种13,200.00 1.00 13,200.00
1.06考勤费分包商滋生2,500.00 2,500.00 1.00
1.07设计和计划的提案很多27,500.00 27,500.00 1.00
1.08内置平面图(如有必要)20,000.00
SUB -合计155,170.72
正在翻譯中..