5.1
5.1.1 found abnormal leakage of pipeline of pipe leakage or rupture immediately stop
5.1.2 leakage water back to the waste water tank to
5.1.3 wash ground and timely repair
5.1.4 repair work immediately repair, recovery after boot device
5.2 wastewater treatment facility for fault can not be normal operation
5.2.1 when it is discovered that the wastewater treatment facilities failure to operate normally, should immediately stop notice each unit and repair
5.2.2 repair is initiated immediately after the equipment, in order to check whether the repair good
5.3 due to the intermittent water caused by abnormal abnormal water
5.3.1 each class is responsible for regular inspections and recording wastewater emissions
5.3.2 when found due to the intermittent water is not normal, stop the discharge, to drain water waste water pool to handle
5.3.3 until discharge requirements stability is achieved, can only be discharged outwards