When 9.4.6.2. Heads of departments and responsibilities should an inspection, indecent, as my colleagues have found that risk of harm should be reported to higher authorities and ESH personnel immediately. <br>9.4.6.3. If abnormal, should take the necessary measures for the maintenance and above automatically check immediately. <br>When 9.4.6.4. Delivery contract or another contract, the contractor such as the use of machinery, equipment or apparatus are provided by KTI, the person in charge shall be made by KTI machinery, equipment or utensils should be implemented on a regular basis and focus of the inspection. Check in the preceding paragraph if necessary to obtain the same embodiment or by a contractor re-contract chambers. The first of the periodic inspection and tests, such as when the focus of the contractor or the contractor has the capacity to implement, to whom agreed in writing by the contractor or another contractor.
正在翻譯中..
