5.2 ie is responsible for layout and evaluation rationality of line body, and is in charge of main line body erection<br>5.3 me is responsible for erecting and calibrating the assembly fixture, summarizing the assembly line configuration, and evaluating the tooling process capability<br>5.4 te is responsible for erecting and debugging the test station, summarizing the configuration of test line, and evaluating the process capability of test equipment<br>5.5 PE is responsible for engineering analysis and maintenance, summarizing corresponding analysis and maintenance configuration, and evaluating engineering capability<br>
正在翻譯中..
