NOTE At this level, the CMMI and IEC 62443-4-1 maturity models are fundamentally the same, with the exception that IEC 62443-4-1 recognizes that there may be a significant delay betweendefining/formalizing a process and executing (practicing) it.Therefore, the execution related aspects of the CMMI-DEV Level 2 are deferred to Level 3.