24. Rainwater Drainage system
24.1 Connection work for the drain between the final manhole with sedimentation pit and the common drain shall be carried out by the contractor approved by MJTD under the instruction of MJTD. Such connection work shall be carried out with attendance of MJTD and/or its assigns. The Locator shall be responsible for constructing the final manhole with sedimentation pit including trash trap within the Plot and its design shall be subject to MJTD's approval in accordance with Article 10. The trash trap just before discharging to MJTD's drain system should be installed, at the Locator's own expense, with (1) screen net to catch floating objects and (2) grease trap to effectively catch oily substance.
24.2 If MJTD wants to check the inside of the trash trap constructed by the
Locator, then the Locator shall admit MJTD's entrance into the Plot.
24.3 The Locator shall properly and cleanly enclose and maintain all drains within the plot, and also between the boundary and the common drain as
shown in Exhibit 5.