I think the biggest difficulty is encountered in cooperation GT ME was a serious shortage of manpower
GT models currently undertaking Ring of many
third plant also needs a lot of engineers to help local agencies
plus the production line problems to be solved
in order to present the human simply can not concentrate on design and real-time problems with the requirements of the proposed response Ring
正在翻譯中..