(8) dipping steel cage, placed catheter, secondary Chiang Khong
A, all of the drilling piles were reinforced steel cage inside the processing forming process. Lifting frame using the rig is complete, effective length less than 12 meters directly under the cages, effective length 12 m above the wellhead once docked. When lifting the steel cage center should coincide with the center hole, using reinforced concrete protective layer round cake, pie radius design protective layer thickness (75mm); the number of arranged according to specifications of each pad section steel cage should be at least two groups, each set of three, should be evenly distributed on the same section, a single reinforcement cage length greater than 12m, it should be added to a group. To ensure that the steel cage position in the hole. Then dipping steel cage bottom casing near the mouth, revealing the orifice is about one meter across with steel reinforcement cage stand on the casing mouth, remains fixed, then hoisting Section steel cage, the cage, and the cage bottom should be perpendicular to the center line ,coincide. After the pairing is complete by the owners and supervision of a professional engineer acceptance, under the reinforcement cage pile top elevation design elevation. With Level ferreted out casing opening level is calculated top of the pile design elevation and Casings port elevation, processing and hanging bars length, hanging bars and reinforcement of butt connections, hanging bars and Casings opening U-shaped bayonet fixed, steel cage installation catheter after installation is complete.
B, the second hole cleaning method using the positive cycle of mud hole cleaning, designated excavation sedimentation in total floorplan, mud pools, due to the local geological conditions, drilling mud slurry is available, when using secondary Chiang Khong 3PN pump catheter into the concrete slurry cleaning time less than 20 minutes.
C, the actual length of the decentralization of concrete pipe as the actual depth of the hole, measuring rope used immediately after the second survey bore deep hole cleaning is completed, the difference between the two is determined sediment thickness meets the design requirements, sediment thickness is less than before the final concrete casting 5cm.
正在翻譯中..