Test scenariosTo create a complete scenario that can be used to test the control schemes, we need,after defining the characteristic of the test network, to specify the load profiles, maximalproduction potentials and electricity prices over the entire period of time. Three differentscenarios, named S1, S2 and S3, are generated as follows.