For Drawing
1) For B01 & B02, please revise the width of aisle (alley) 8M to 12M.
2) For B01 & B02, please revise the distance of pillars (O/O OF STEEL LINES)
B01, Bay Sapcing (m): 18@8 == >> pls revise as 15@8 + 4@6
B02, Bay Sapcing (m): 21@8 == >> pls revise as 18@8 + 4@6
3) 2F crane installing of B01 & B02, how much load of the wheel pressure is?
Is it including in this proposal?
4) Per our previous request that the floor robust load of 2F Foaming working shop is 1ton above & 600kgs above separately, and pls remark it on the drawing.
Is there any price changeable of the above revise?
We hope all the revised contents are under safety considerations as a precondition.
Looking forward to your reply.
For Drawing 1) For B01 & B02, please revise the width of aisle (alley) 8M to 12M. 2) For B01 & B02, please revise the distance of pillars (O/O OF STEEL LINES) B01, Bay Sapcing (m): 18@8 == >> pls revise as 15@8 + 4@6 B02, Bay Sapcing (m): 21@8 == >> pls revise as 18@8 + 4@63) 2F crane installing of B01 & B02, how much load of the wheel pressure is? Is it including in this proposal?4) Per our previous request that the floor robust load of 2F Foaming working shop is 1ton above & 600kgs above separately, and pls remark it on the drawing. Is there any price changeable of the above revise? We hope all the revised contents are under safety considerations as a precondition.Looking forward to your reply.